Latest case studies

  • Dockland office building (Hamburg, Germany)

    Equipment of the technique area (new construction) with Tektalan SD and LP wood wool (1,600 m2).

  • Cleveland Browns Stadium (Cleveland, Ohio, USA)

    Knauf 1000° Pipe Insulation, Duct Wrap and Insulation Board.
    The Cleveland Brown's 72,500-capacity stadium counts on over 11.65 miles (17.7 kilometers) of Knauf 1000° Pipe Insulation and 120,000 ft2 (11,148 m2) of Knauf Duct Wrap and Knauf Insulation Board to maintain a new level of comfort in this open-air stadium.

  • Farnborough Airport (Hampshire, UK)

    Crown FactoryClad, glass mineral wool product (3,500 m2) was used in this project for a built-up metal system to produce a 35m high control tower (including operations and terminal buildings) and new hangars.

  • Rolls Royce (UK)
  • Farnborough airport (UK)
  • Tour de Granite (Paris, France)
  • Burgers' Zoo (Arnhem, The Netherlands)
  • Burgers' Zoo (Arnhem, The Netherlands)